Waterfall Project Assessment Template
📄
💾 Downloadwaterfall-project-assessment-template.md
Markdown • 4,257 bytes
--- title: "Waterfall Project Assessment Template" methodology: "traditional" complexity: "starter" process_group: "initiating" industry: "financial" role: "stakeholder" tags: ["traditional", "initiating", "stakeholder-management", "planning", "quality"] version: "1.0.0" owner: "mirichard" updated: "2026-09-19" estimated_completion_time: "15-30 minutes" primary_principles: ["evidence-based-decisions", "quality-by-design"] secondary_principles: ["stewardship"] principle_rationale: "Assesses predictive phase readiness against requirements, baselines and test evidence to support accountable gate decisions and corrective action." --- # Waterfall Project Assessment Template ## When to Use - When assessing a predictive project's phase readiness and management practices. - When reviewers can evaluate gate evidence, baselines, and corrective actions. ## When NOT to Use - To approve a phase merely because its checklist has been populated. - Do not represent author self-checks as independent or authorized approval. See [Self-approval](../../../docs/principles/anti-patterns.md#self-approval). ## Pairs Well With - [Project Health Assessment Template](../../../domains/measurement/project-assessment-suite/project-health-assessment-template.md). - [Governance Assessment Template](../../../domains/measurement/project-assessment-suite/governance-assessment-template.md). Selection context: Stakeholder domain; traditional methodology; starter complexity. Match the situations above to project phase, risk, team size, and industry using the [decision-engine context model](../../../meta/architecture-research/800-801-context-assessment-model.md). ## Executive Summary This template provides assessment criteria specifically for traditional waterfall project management approaches. ## Waterfall Assessment Framework **Project:** [Project name] **Phase:** [Current project phase] **Assessment Date:** [Date] **Project Duration:** [Timeline] ## Phase Gate Assessment ### 1. Requirements Management **Requirements Quality:** - [ ] Requirements completeness - [ ] Requirements clarity and testability - [ ] Change control effectiveness - [ ] Traceability maintenance **Phase Gate Criteria:** - [ ] All requirements documented and approved - [ ] Stakeholder sign-off obtained - [ ] Change control process established ### 2. Design and Architecture **Design Assessment:** - [ ] Architecture documentation quality - [ ] Design review completeness - [ ] Technical standards compliance - [ ] Integration planning adequacy ### 3. Implementation Management **Implementation Effectiveness:** - [ ] Coding standards adherence - [ ] Quality assurance processes - [ ] Progress tracking accuracy - [ ] Issue resolution efficiency ### 4. Testing and Quality **Quality Assurance:** - [ ] Test planning completeness - [ ] Test execution effectiveness - [ ] Defect management process - [ ] User acceptance testing ## Phase Gate Approval **Gate Criteria Met:** - [ ] Phase deliverables completed - [ ] Quality criteria satisfied - [ ] Stakeholder approval obtained - [ ] Next phase readiness confirmed ## Assessment method and evidence Tailor the criteria to the project before scoring. This is a lightweight internal assessment, not a certification or formal appraisal. Mark inapplicable criteria N/A with a rationale; distinguish missing evidence from poor performance. Use a locally agreed scale: 1 = absent/ad hoc; 2 = inconsistently applied; 3 = defined and routinely applied; 4 = measured and controlled; 5 = improved using measured outcomes. Record evidence for each rating. Do not average scores with N/A or unassessed items. | Criterion | Rating / N/A / not assessed | Dated evidence and rationale | Gap / impact | Action / owner / due date | Completion evidence | |---|---|---|---|---|---| | [Criterion] | [Rating] | [Source and observation] | [Gap] | [Action / name / date] | [Observable acceptance condition] | - **Assessment limitations:** [Sampling, unavailable information, assessor familiarity] - **Stakeholder review:** [Reviewer / date / disputed findings] - **Follow-up review:** [Date and accountable owner] Related Resources: - [Traditional Framework](../../../templates/traditional/) - [Project Lifecycle](../project-lifecycle/)