# User Acceptance Testing (UAT) Plan Template

## When to Use

- Before user acceptance testing when business users need scenarios, evidence, and decision ownership.
- When test planning must reflect user roles, business risks, and acceptance criteria.

## When NOT to Use

- To substitute technical test completion for business acceptance.
- Do not represent author self-checks as independent or authorized approval. See [Self-approval](../../../../../../docs/principles/anti-patterns.md#self-approval).

## Pairs Well With

- [Uat Strategy Template](../../../../../../domains/delivery/templates/traditional/Traditional/Templates/uat_strategy_template.md).
- [Requirements Traceability Matrix Template](../../../../../../domains/delivery/templates/traditional/Traditional/Process_Groups/Executing/requirements_traceability_matrix_template.md).

Selection context: Delivery domain; traditional methodology; advanced complexity. Match the situations above to project phase, risk, team size, and industry using the [decision-engine context model](../../../../../../meta/architecture-research/800-801-context-assessment-model.md).

## Completing the worksheet

Replace populated examples with project evidence before circulation. Record the reporting period, baseline, source, owner, and calculation for each measure; define thresholds and approval authority locally. Show unavailable values as unknown rather than zero or a favorable status. Reconcile totals and units, handle zero denominators explicitly, and retain the decision rationale and supporting evidence.


## Document Information
| Field | Value |
|-------|-------|
| **Project Name** | [Enter project name] |
| **Document Version** | [e.g., 1.0] |
| **Date** | [Current date] |
| **Prepared By** | [UAT Manager/Test Lead name] |
| **Approved By** | [Project Manager/Sponsor name] |
| **Next Review Date** | [Date for next review] |

## Template Usage Guide

**For Large/Complex Programs**: First complete the [UAT Strategy Template](uat_strategy_template.md) to establish strategic framework and stakeholder management approach, then use this template for detailed execution planning.

**For Standard Projects**: This template provides comprehensive planning for straightforward UAT implementations.

**Template Relationship**: [Strategy](uat_strategy_template.md) → Plan (this template) → Execution

---
## Executive Summary

### Purpose
[Describe the purpose of this UAT plan and its relationship to the overall project]

### Scope of UAT
[Define what will be tested during UAT and what is excluded from UAT scope]

### UAT Objectives
[List the key objectives that UAT aims to achieve]

## Project Context

### Project Overview
[Brief description of the project and its deliverables]

### Business Requirements Summary
| Requirement ID | Requirement Description | Priority | UAT Coverage |
|----------------|------------------------|----------|---------------|
| [REQ-001] | | High/Medium/Low | Yes/No |
| [REQ-002] | | High/Medium/Low | Yes/No |
| [REQ-003] | | High/Medium/Low | Yes/No |

### System/Solution Overview
[Description of the system or solution being tested]

## UAT Scope and Objectives

### In Scope
- [Item 1 - e.g., Core business processes]
- [Item 2 - e.g., User interface functionality]
- [Item 3 - e.g., Integration with existing systems]
- [Item 4 - e.g., Performance under normal load]
- [Item 5 - e.g., Security and access controls]

### Out of Scope
- [Item 1 - e.g., System administration functions]
- [Item 2 - e.g., Database recovery procedures]
- [Item 3 - e.g., Technical infrastructure testing]
- [Item 4 - e.g., Performance under stress conditions]

### UAT Objectives
1. **Business Validation**: Verify the solution meets business requirements
2. **User Experience**: Confirm the solution is usable by end users
3. **Process Support**: Validate business processes are properly supported
4. **Quality Assurance**: Ensure solution quality meets acceptance standards
5. **Readiness Confirmation**: Confirm readiness for production deployment

## Acceptance Criteria

### Business Acceptance Criteria
| Criteria ID | Description | Success Measure | Priority |
|-------------|-------------|-----------------|----------|
| [BAC-001] | [Business process completion] | [95% success rate] | Must Have |
| [BAC-002] | [User task completion] | [90% completion without assistance] | Must Have |
| [BAC-003] | [Data accuracy] | [99.9% data integrity] | Must Have |
| [BAC-004] | [Integration functionality] | [All interfaces operational] | Must Have |
| [BAC-005] | [Performance requirements] | [Response time < 3 seconds] | Should Have |

### Technical Acceptance Criteria
| Criteria ID | Description | Success Measure | Priority |
|-------------|-------------|-----------------|----------|
| [TAC-001] | [System availability] | [99.5% uptime during testing] | Must Have |
| [TAC-002] | [Error handling] | [Graceful error recovery] | Must Have |
| [TAC-003] | [Security controls] | [All access controls functional] | Must Have |
| [TAC-004] | [Backup/recovery] | [Data recovery within SLA] | Should Have |

### User Experience Criteria
| Criteria ID | Description | Success Measure | Priority |
|-------------|-------------|-----------------|----------|
| [UXC-001] | [Ease of use] | [User satisfaction > 4.0/5.0] | Must Have |
| [UXC-002] | [Learning curve] | [80% tasks completed after 1 hour training] | Should Have |
| [UXC-003] | [Accessibility] | [WCAG 2.1 AA compliance] | Must Have |
| [UXC-004] | [Mobile responsiveness] | [Full functionality on mobile devices] | Could Have |

## UAT Strategy and Approach

### Testing Strategy
- **Black Box Testing**: Focus on functionality from user perspective
- **End-to-End Testing**: Complete business process validation
- **Regression Testing**: Ensure existing functionality remains intact
- **Exploratory Testing**: Discover issues through unscripted testing
- **Performance Testing**: Validate performance under realistic loads

### Testing Types
| Testing Type | Description | Coverage | Responsibility |
|--------------|-------------|----------|----------------|
| Functional Testing | Core feature validation | [% coverage] | Business Users |
| Integration Testing | System connectivity | [% coverage] | Technical Users |
| Workflow Testing | End-to-end processes | [% coverage] | Process Owners |
| Usability Testing | User experience | [% coverage] | End Users |
| Security Testing | Access and permissions | [% coverage] | Security Team |

### Test Approach
- **Phase 1**: Core functionality testing (Weeks 1-2)
- **Phase 2**: Integration and workflow testing (Weeks 3-4)
- **Phase 3**: Performance and security testing (Week 5)
- **Phase 4**: User experience and usability testing (Week 6)
- **Phase 5**: Regression and final acceptance (Week 7)

## Test Environment

### Environment Requirements
| Component | Specification | Status | Notes |
|-----------|---------------|--------|-------|
| **Hardware** | | | |
| Application Server | | | |
| Database Server | | | |
| Network Infrastructure | | | |
| **Software** | | | |
| Operating System | | | |
| Application Software | | | |
| Database Software | | | |
| **Data** | | | |
| Test Data Volume | | | |
| Data Refresh Strategy | | | |
| Data Privacy Compliance | | | |

### Environment Setup
- [ ] Hardware provisioned and configured
- [ ] Software installed and configured
- [ ] Network connectivity established
- [ ] Security controls implemented
- [ ] Test data loaded and validated
- [ ] User accounts created and permissions set
- [ ] Integration points configured and tested
- [ ] Performance monitoring tools installed
- [ ] Backup and recovery procedures tested

### Environment Access
| User Role | Access Level | VPN Required | Training Required |
|-----------|--------------|--------------|-------------------|
| Business Users | Application access | Yes/No | Yes/No |
| Technical Users | Extended access | Yes/No | Yes/No |
| UAT Coordinators | Administrative | Yes/No | Yes/No |

## Test Data Management

### Data Requirements
| Data Category | Volume | Source | Refresh Frequency |
|---------------|--------|--------|-------------------|
| Customer Data | [# records] | [Production/Synthetic] | [Daily/Weekly] |
| Transaction Data | [# records] | [Production/Synthetic] | [Daily/Weekly] |
| Reference Data | [# records] | [Production/Current] | [As needed] |
| Configuration Data | [# items] | [Production/Custom] | [As needed] |

### Data Privacy and Security
- [ ] Personal data anonymized/masked
- [ ] Sensitive data encrypted
- [ ] Access controls implemented
- [ ] Data retention policies defined
- [ ] Compliance requirements met

### Data Management Process
1. **Data Identification**: Catalog required test data
2. **Data Acquisition**: Extract or generate test data
3. **Data Preparation**: Clean, transform, and mask data
4. **Data Loading**: Load data into test environment
5. **Data Validation**: Verify data quality and completeness
6. **Data Refresh**: Regular updates as needed
7. **Data Cleanup**: Secure disposal after testing

## UAT Team Organization

### Roles and Responsibilities

#### UAT Manager
- **Name**: [Name]
- **Responsibilities**:
  - Overall UAT coordination and management
  - Stakeholder communication and reporting
  - Resource allocation and issue escalation
  - UAT schedule and milestone tracking

#### Business Sponsor
- **Name**: [Name]
- **Responsibilities**:
  - Final acceptance authority
  - Business requirement validation
  - User community representation
  - Go-live decision making

#### Test Coordinators
| Name | Area | Responsibilities |
|------|------|------------------|
| [Name] | [Business Area 1] | Test execution coordination, defect triage |
| [Name] | [Business Area 2] | User training, feedback collection |
| [Name] | [Technical Area] | Environment management, technical support |

#### Business Users
| Name | Role | Department | Experience Level |
|------|------|------------|------------------|
| [Name] | [Job Title] | [Department] | Novice/Intermediate/Expert |
| [Name] | [Job Title] | [Department] | Novice/Intermediate/Expert |
| [Name] | [Job Title] | [Department] | Novice/Intermediate/Expert |

#### Technical Support
| Name | Role | Responsibilities |
|------|------|------------------|
| [Name] | Developer | Defect analysis and resolution |
| [Name] | System Admin | Environment support |
| [Name] | DBA | Database support |

### Communication Structure
- **Daily Standups**: UAT team (15 minutes)
- **Weekly Status**: Steering committee (30 minutes)
- **Bi-weekly Reviews**: All stakeholders (60 minutes)
- **Escalation Path**: UAT Manager → Project Manager → Sponsor

## Test Planning and Design

### Test Case Development

#### Test Case Template
| Field | Description |
|-------|-------------|
| Test Case ID | Unique identifier |
| Test Case Name | Descriptive name |
| Business Process | Associated business process |
| Requirement ID | Linked requirement |
| Preconditions | Setup required before test |
| Test Steps | Detailed execution steps |
| Expected Results | What should happen |
| Actual Results | What actually happened |
| Status | Pass/Fail/Blocked |
| Defect ID | Associated defect if failed |

#### Test Case Categories
| Category | Number of Cases | Coverage |
|----------|-----------------|----------|
| Core Business Functions | [#] | [%] |
| User Interface | [#] | [%] |
| Data Entry/Validation | [#] | [%] |
| Reporting | [#] | [%] |
| Integration | [#] | [%] |
| Security | [#] | [%] |
| **Total** | [#] | [%] |

### Test Script Development
- **Detailed Scripts**: Step-by-step instructions for complex scenarios
- **Exploratory Guidelines**: High-level guidance for unscripted testing
- **Data Requirements**: Specific data needed for each test
- **Expected Outcomes**: Clear definition of success criteria

## UAT Execution

### Execution Schedule
| Phase | Start Date | End Date | Duration | Activities |
|-------|------------|----------|----------|------------|
| UAT Preparation | [Date] | [Date] | [Days] | Environment setup, training |
| UAT Phase 1 | [Date] | [Date] | [Days] | Core functionality testing |
| UAT Phase 2 | [Date] | [Date] | [Days] | Integration testing |
| UAT Phase 3 | [Date] | [Date] | [Days] | End-to-end testing |
| UAT Phase 4 | [Date] | [Date] | [Days] | Regression testing |
| UAT Closure | [Date] | [Date] | [Days] | Final acceptance, documentation |

### Daily Execution Process
1. **Morning Standup** (9:00 AM - 9:15 AM)
   - Review previous day results
   - Plan current day activities
   - Identify blockers and issues

2. **Test Execution** (9:15 AM - 12:00 PM, 1:00 PM - 5:00 PM)
   - Execute planned test cases
   - Document results and issues
   - Collaborate with technical team on defects

3. **End-of-Day Wrap-up** (5:00 PM - 5:30 PM)
   - Update test execution status
   - Log new defects
   - Plan next day activities

### Test Execution Tracking
| Metric | Target | Current | Status |
|--------|--------|---------|--------|
| Test Cases Executed | [#] | [#] | On Track/Behind/Ahead |
| Test Cases Passed | [%] | [%] | Green/Yellow/Red |
| Defects Found | [#] | [#] | Trend |
| Defects Resolved | [%] | [%] | Green/Yellow/Red |

## Defect Management

### Defect Classification

#### Severity Levels
| Level | Definition | Response Time | Examples |
|-------|------------|---------------|----------|
| **Critical** | System unusable, data loss | 4 hours | Application crash, data corruption |
| **High** | Major functionality broken | 24 hours | Core process failure, security breach |
| **Medium** | Moderate impact on operations | 72 hours | Performance issues, minor feature failure |
| **Low** | Cosmetic or minor issues | Next release | UI formatting, spelling errors |

#### Priority Levels
| Level | Definition | Business Impact |
|-------|------------|------------------|
| **P1** | Must fix before go-live | Prevents go-live |
| **P2** | Should fix before go-live | Significant impact |
| **P3** | Could fix after go-live | Minor impact |
| **P4** | Enhancement for future | No immediate impact |

### Defect Workflow
1. **Discovery**: Defect identified during testing
2. **Logging**: Defect recorded in tracking system
3. **Triage**: Severity and priority assigned
4. **Assignment**: Defect assigned to developer
5. **Resolution**: Developer fixes defect
6. **Verification**: Tester verifies fix
7. **Closure**: Defect closed when verified

### Defect Tracking
| Status | Count | Percentage |
|-----------|-------|------------|
| Open | [#] | [%] |
| In Progress | [#] | [%] |
| Fixed | [#] | [%] |
| Verified | [#] | [%] |
| Closed | [#] | [%] |
| **Total** | [#] | **100%** |

## Risk Management

### UAT Risks
| Risk | Probability | Impact | Mitigation Strategy | Owner |
|------|-------------|--------|---------------------|-------|
| User unavailability | Medium | High | Backup users identified | UAT Manager |
| Environment instability | Low | High | Backup environment ready | Technical Lead |
| Data quality issues | Medium | Medium | Data validation process | Data Manager |
| Schedule delays | Medium | High | Buffer time built in | Project Manager |
| Scope creep | Medium | Medium | Change control process | Business Sponsor |

### Issue Escalation
| Issue Type | Level 1 | Level 2 | Level 3 |
|------------|---------|---------|----------|
| Technical | Developer | Technical Lead | IT Manager |
| Business | UAT Coordinator | Business Analyst | Business Sponsor |
| Resource | UAT Manager | Project Manager | Steering Committee |
| Schedule | UAT Manager | Project Manager | Executive Sponsor |

## Communication and Reporting

### Communication Plan

#### Stakeholder Communication
| Stakeholder | Method | Frequency | Content |
|-------------|--------|-----------|----------|
| Executive Sponsor | Email summary | Weekly | High-level progress, issues |
| Project Steering Committee | Formal report | Bi-weekly | Detailed progress, metrics |
| Business Users | Team meetings | Daily | Test activities, immediate issues |
| Development Team | Defect reports | Real-time | Technical issues, fixes needed |

#### Reporting Schedule
| Report | Audience | Frequency | Delivery Method |
|--------|----------|-----------|------------------|
| Daily Status | UAT Team | Daily | Standup meeting |
| Weekly Dashboard | Stakeholders | Weekly | Email/SharePoint |
| UAT Progress Report | Steering Committee | Bi-weekly | Formal presentation |
| Final UAT Report | All | End of UAT | Document + presentation |

### Status Reporting

#### Weekly Status Report Template
- **Overall Status**: Green/Yellow/Red
- **Completed This Week**: [Summary of accomplishments]
- **Planned Next Week**: [Upcoming activities]
- **Issues and Risks**: [Current concerns]
- **Metrics Summary**: [Key performance indicators]
- **Decisions Needed**: [Items requiring stakeholder input]

## Training and Support

### User Training Plan

#### Training Requirements
| User Group | Training Type | Duration | Delivery Method | Trainer |
|------------|---------------|----------|------------------|---------|
| End Users | Basic system usage | 4 hours | In-person/Virtual | [Name] |
| Power Users | Advanced features | 8 hours | Hands-on workshop | [Name] |
| Administrators | System administration | 16 hours | Technical training | [Name] |

#### Training Materials
- [ ] User manuals and guides
- [ ] Training presentations
- [ ] Hands-on exercises
- [ ] Video tutorials
- [ ] Quick reference cards
- [ ] FAQ documents

### Support Structure

#### During UAT
| Support Type | Availability | Contact Method | Response Time |
|--------------|--------------|----------------|---------------|
| Technical Support | Business hours | Phone/Email/Chat | 1 hour |
| Business Support | Business hours | Email/In-person | 2 hours |
| Emergency Support | 24/7 | Phone | 30 minutes |

#### Post-UAT
- **Go-Live Support**: Extended hours for first week
- **User Help Desk**: Ongoing support structure
- **Documentation**: Comprehensive user guides
- **Training Programs**: Ongoing user education

## Acceptance Decision Process

### Decision Criteria

#### Go/No-Go Criteria
| Criteria | Threshold | Current Status | Met (Y/N) |
|----------|-----------|----------------|------------|
| Critical defects resolved | 100% | [%] | |
| High priority defects resolved | 95% | [%] | |
| Business acceptance criteria met | 100% | [%] | |
| User satisfaction score | ≥ 4.0/5.0 | [Score] | |
| Performance requirements met | 100% | [%] | |

#### Acceptance Levels
- **Full Acceptance**: All criteria met, proceed to production
- **Conditional Acceptance**: Minor issues, proceed with mitigation plan
- **Rejection**: Major issues, return to development

### Sign-off Process

#### Acceptance Authority
| Role | Responsibility | Required for Go-Live |
|------|----------------|----------------------|
| Business Sponsor | Overall business acceptance | Yes |
| IT Manager | Technical acceptance | Yes |
| Security Manager | Security compliance | Yes |
| Compliance Officer | Regulatory compliance | If applicable |

#### Sign-off Documentation
- [ ] UAT Execution Summary
- [ ] Defect Resolution Report
- [ ] Performance Test Results
- [ ] Security Assessment Report
- [ ] User Feedback Summary
- [ ] Risk Assessment and Mitigation
- [ ] Go-Live Readiness Checklist

## UAT Closure

### Closure Activities
1. **Final Test Execution Summary**
   - Total test cases executed
   - Pass/fail rates
   - Defect resolution status

2. **Lessons Learned Capture**
   - What worked well
   - Areas for improvement
   - Recommendations for future UATs

3. **Knowledge Transfer**
   - Handover to support teams
   - Documentation finalization
   - Training material updates

4. **Environment Cleanup**
   - Test data archival/deletion
   - Environment decommissioning
   - Resource release

### Success Metrics
| Metric | Target | Actual | Variance |
|--------|--------|--------|----------|
| Test execution rate | 100% | [%] | [%] |
| Defect detection rate | [#] | [#] | [#] |
| User satisfaction | ≥ 4.0/5.0 | [Score] | [Difference] |
| Schedule adherence | 100% | [%] | [Days] |
| Budget adherence | 100% | [%] | [$] |

## Appendices

### Appendix A: Test Case Repository
[Link to detailed test cases]

### Appendix B: Test Data Specifications
[Detailed test data requirements]

### Appendix C: Environment Setup Guide
[Technical environment configuration]

### Appendix D: User Training Materials
[Training guides and materials]

### Appendix E: Defect Log Template
[Standardized defect reporting format]

### Appendix F: Communication Templates
[Email templates and report formats]

---

**Instructions for Use:**
1. Replace all bracketed placeholders with project-specific information
2. Customize sections based on project complexity and requirements
3. Remove sections not applicable to your project
4. Ensure alignment with overall project management plan
5. Regular updates throughout the UAT lifecycle
6. Use in conjunction with other Traditional testing and quality documents

**Related Templates:**
- [UAT Test Case Fields](#test-case-template)
- [UAT Weekly Execution Status Report](#weekly-status-report-template)
- [UAT Sign-off Process and Required Evidence](#sign-off-process)
- [Project Quality Management Plan](../Process_Groups/Planning/project_management_plan_template.md#5-quality-management)