Manufacturing Batch Record Template
📄
💾 Downloadmanufacturing_batch_record_template.md
Markdown • 27,613 bytes
--- title: "Manufacturing Batch Record Template" methodology: "universal" complexity: "advanced" owner: "mirichard" updated: "2026-09-19" primary_principles: ["stewardship", "quality-by-design"] secondary_principles: ["evidence-based-decisions"] principle_rationale: "Captures manufacturing execution, material reconciliation and deviations in a controlled record for accountable quality review and disposition." --- # Manufacturing Batch Record Template ## When to Use - When preparing a manufacturing batch record tailored to the approved site process. - When operations and quality must capture execution, reconciliation, and deviations consistently. ## When NOT to Use - As a second conflicting master record for a batch already governed by an approved system. - Do not treat completed metadata or a filled checklist as evidence that the underlying work is done. See [Metadata theater](../../../../../docs/principles/anti-patterns.md#metadata-theater). ## Pairs Well With - [Batch Record Template](../../../../../domains/delivery/industry-specializations/healthcare-pharmaceutical/manufacturing/batch_record_template.md). - [Process Control Template](../../../../../domains/delivery/industry-specializations/healthcare-pharmaceutical/manufacturing/process_control_template.md). Selection context: Delivery domain; universal methodology; advanced complexity. Match the situations above to project phase, risk, team size, and industry using the [decision-engine context model](../../../../../meta/architecture-research/800-801-context-assessment-model.md). ## Applying this template Treat filled examples, dates, numerical limits, sampling frequencies, and approval outcomes as illustrations. Before execution, replace them with the approved product/site requirements, scientific rationale, method references, responsible reviewer, and acceptance evidence. Record the applicable jurisdiction and current guidance edition; a completed worksheet alone does not demonstrate regulatory compliance. | Requirement or limit | Applicable source / edition | Product-specific rationale | Approval / date | Execution evidence | |---|---|---|---|---| | [Requirement] | [Source] | [Rationale] | [Reviewer / date] | [Record] | ## Document Control **Document ID:** [MBR-XXX]\ **Version:** [1.0] **Effective Date:** [YYYY-MM-DD] **Review Date:** [YYYY-MM-DD] **Supersedes:** [Previous version, if applicable] **Product:** [Product Name] **Classification:** [e.g., Sterile/Non-sterile, Controlled Substance Class] **Last Updated:** [YYYY-MM-DD] ### Document History | Version | Date | Description of Change | Author | Approved By | |---------|------|------------------------|--------|------------| | 1.0 | YYYY-MM-DD | Initial release | [Name] | [Name] | ### Distribution List | Name | Department/Role | Date Distributed | |------|----------------|------------------| | [Name] | [Department/Role] | [YYYY-MM-DD] | | [Name] | [Department/Role] | [YYYY-MM-DD] | ### Retention Period This document must be retained for a minimum of [X] years after the expiry date of the relevant batch or as required by applicable regulations, whichever is longer. --- ## 1. Batch Record Header ### 1.1 Product Information | Field | Information | |-------|-------------| | **Product Name** | [Product name as per marketing authorization] | | **Product Code** | [Internal product code] | | **Dosage Form** | [Tablet/Capsule/Injectable/Cream/etc.] | | **Strength** | [e.g., 10 mg, 50 mg/ml, etc.] | | **Batch Size** | [Standard batch size, e.g., 100,000 tablets] | | **Pharmacopeia Reference** | [USP/BP/EP/JP/IP, etc.] | | **Marketing Authorization Number** | [If applicable] | ### 1.2 Batch Identification | Field | Information | Verified By | Date | |-------|-------------|-------------|------| | **Batch Number** | [Unique batch identifier] | | | | **Manufacturing Date** | [YYYY-MM-DD] | | | | **Expiry Date** | [YYYY-MM-DD] | | | | **Campaign Number** | [If applicable] | | | | **Manufacturing Location** | [Facility name and address] | | | | **Manufacturing Suite/Line** | [Specific production area] | | | ### 1.3 Manufacturing Authorization | Role | Name | Signature | Date | |------|------|-----------|------| | **Production Manager** | | | | | **Quality Assurance** | | | | > **Note:** Production shall not commence without proper authorization. Ensure all pre-production checks are completed and documented. --- ## 2. Material Section ### 2.1 Raw Materials | Material Name | Material Code | Required Quantity | Batch Number | Expiry Date | Vendor | Weighed Quantity | Weighed By | Verified By | Date | |---------------|--------------|-------------------|--------------|-------------|--------|------------------|-----------|------------|------| | [Material 1] | [Code] | [Quantity with units] | | | | | | | | | [Material 2] | [Code] | [Quantity with units] | | | | | | | | | [Material 3] | [Code] | [Quantity with units] | | | | | | | | ### 2.2 Material Verification Checklist - [ ] All raw materials verified against specifications - [ ] All raw materials are within expiry date - [ ] All raw material containers are intact and properly labeled - [ ] All raw materials have passed quality control testing - [ ] All material dispensing performed in appropriate conditions (temperature, humidity) - [ ] Cross-contamination prevention measures followed - [ ] Balance/scale calibration verified and within valid date - [ ] Material weighing calculations double-checked - [ ] All material movement documented in inventory/ERP system ### 2.3 Packaging Materials | Material Name | Material Code | Required Quantity | Batch Number | Expiry Date | Vendor | Issued Quantity | Issued By | Verified By | Date | |---------------|--------------|-------------------|--------------|-------------|--------|-----------------|-----------|------------|------| | [Primary container] | [Code] | [Quantity with units] | | | | | | | | | [Closure system] | [Code] | [Quantity with units] | | | | | | | | | [Label] | [Code] | [Quantity with units] | | | | | | | | | [Carton] | [Code] | [Quantity with units] | | | | | | | | ### 2.4 Label Verification | Check | Verified By | Date | |-------|------------|------| | Label content matches product specification | | | | Batch number correctly printed | | | | Expiry date correctly printed | | | | Storage conditions correctly stated | | | | Barcode/serialization (if applicable) verified | | | | Controlled substance warnings (if applicable) | | | | Patient information leaflet verified | | | --- ## 3. Equipment and Room Preparation ### 3.1 Manufacturing Rooms | Room ID | Purpose | Required Conditions | Actual Conditions | Verified By | Date | |---------|---------|---------------------|------------------|------------|------| | [Room ID] | [e.g., Weighing] | Temperature: [20-25°C]<br>Humidity: [30-60% RH]<br>Differential Pressure: [≥10 Pa] | Temp: [ ]<br>Humidity: [ ]<br>Diff Pressure: [ ] | | | | [Room ID] | [e.g., Granulation] | Temperature: [20-25°C]<br>Humidity: [30-60% RH]<br>Differential Pressure: [≥10 Pa] | Temp: [ ]<br>Humidity: [ ]<br>Diff Pressure: [ ] | | | | [Room ID] | [e.g., Compression] | Temperature: [20-25°C]<br>Humidity: [30-60% RH]<br>Differential Pressure: [≥10 Pa] | Temp: [ ]<br>Humidity: [ ]<br>Diff Pressure: [ ] | | | ### 3.2 Line Clearance | Check | Status | Verified By | Date | |-------|--------|------------|------| | Previous batch materials removed | | | | | Equipment cleaned and status labeled | | | | | Room cleaned and status labeled | | | | | No materials from other products present | | | | | Line clearance documented with photographs (if applicable) | | | | | All documentation from previous batch removed | | | | | Line clearance approved by QA | | | | ### 3.3 Equipment List | Equipment | Equipment ID | Calibration Due Date | Clean Status | Preventive Maintenance Status | Verified By | Date | |-----------|-------------|----------------------|--------------|------------------------------|------------|------| | [Equipment 1, e.g., Mixer] | [ID] | [YYYY-MM-DD] | | | | | | [Equipment 2, e.g., Mill] | [ID] | [YYYY-MM-DD] | | | | | | [Equipment 3, e.g., Tablet Press] | [ID] | [YYYY-MM-DD] | | | | | | [Equipment 4, e.g., Coating System] | [ID] | [YYYY-MM-DD] | | | | | ### 3.4 Equipment Setup and Verification | Equipment | Parameter | Specification | Actual Setting | Verified By | Date | |-----------|-----------|---------------|---------------|------------|------| | [Equipment 1] | [e.g., Speed] | [e.g., 20-25 RPM] | | | | | [Equipment 1] | [e.g., Time] | [e.g., 15 ± 1 min] | | | | | [Equipment 2] | [e.g., Speed] | [e.g., 50-60 RPM] | | | | | [Equipment 2] | [e.g., Temperature] | [e.g., 50 ± 2°C] | | | | ### 3.5 Computerized Systems Check (if applicable) | System | System ID | Version | Backup Status | Data Integrity Controls | Verified By | Date | |--------|-----------|---------|--------------|-------------------------|------------|------| | [System 1, e.g., EBR] | [ID] | [Version] | | | | | | [System 2, e.g., SCADA] | [ID] | [Version] | | | | | --- ## 4. Manufacturing Instructions ### 4.1 Process Step 1: [Step Name, e.g., Raw Material Dispensing] **Purpose:** [Brief description of the step purpose] **Materials Required:** - [Material 1] - [Material 2] **Equipment Required:** - [Equipment 1] - [Equipment 2] **Procedure:** 1. [Detailed instruction] - Critical Parameter: [Specification] - Acceptance Criteria: [Criteria] - Actual Value: _____________ Operator: _____________ Date: _____________ - Verified By: _____________ Date: _____________ 2. [Detailed instruction] - Critical Parameter: [Specification] - Acceptance Criteria: [Criteria] - Actual Value: _____________ Operator: _____________ Date: _____________ - Verified By: _____________ Date: _____________ 3. [Detailed instruction] - Critical Parameter: [Specification] - Acceptance Criteria: [Criteria] - Actual Value: _____________ Operator: _____________ Date: _____________ - Verified By: _____________ Date: _____________ **In-Process Control:** | Test | Specification | Result | Tested By | Verified By | Date | |------|---------------|--------|-----------|------------|------| | [IPC Test 1] | [Specification] | | | | | | [IPC Test 2] | [Specification] | | | | | ### 4.2 Process Step 2: [Step Name, e.g., Granulation] **Purpose:** [Brief description of the step purpose] **Materials Required:** - [Material 1] - [Material 2] **Equipment Required:** - [Equipment 1] - [Equipment 2] **Procedure:** 1. [Detailed instruction] - Critical Parameter: [Specification] - Acceptance Criteria: [Criteria] - Actual Value: _____________ Operator: _____________ Date: _____________ - Verified By: _____________ Date: _____________ 2. [Detailed instruction] - Critical Parameter: [Specification] - Acceptance Criteria: [Criteria] - Actual Value: _____________ Operator: _____________ Date: _____________ - Verified By: _____________ Date: _____________ 3. [Detailed instruction] - Critical Parameter: [Specification] - Acceptance Criteria: [Criteria] - Actual Value: _____________ Operator: _____________ Date: _____________ - Verified By: _____________ Date: _____________ **In-Process Control:** | Test | Specification | Result | Tested By | Verified By | Date | |------|---------------|--------|-----------|------------|------| | [IPC Test 1] | [Specification] | | | | | | [IPC Test 2] | [Specification] | | | | | ### 4.3 Process Step 3: [Step Name, e.g., Compression/Filling/etc.] **Purpose:** [Brief description of the step purpose] **Materials Required:** - [Material 1] - [Material 2] **Equipment Required:** - [Equipment 1] - [Equipment 2] **Procedure:** 1. [Detailed instruction] - Critical Parameter: [Specification] - Acceptance Criteria: [Criteria] - Actual Value: _____________ Operator: _____________ Date: _____________ - Verified By: _____________ Date: _____________ 2. [Detailed instruction] - Critical Parameter: [Specification] - Acceptance Criteria: [Criteria] - Actual Value: _____________ Operator: _____________ Date: _____________ - Verified By: _____________ Date: _____________ 3. [Detailed instruction] - Critical Parameter: [Specification] - Acceptance Criteria: [Criteria] - Actual Value: _____________ Operator: _____________ Date: _____________ - Verified By: _____________ Date: _____________ **In-Process Control:** | Test | Specification | Sampling Frequency | Results | Tested By | Verified By | Date | |------|---------------|-------------------|---------|-----------|------------|------| | [IPC Test 1] | [Specification] | [e.g., Every 30 minutes] | | | | | | [IPC Test 2] | [Specification] | [e.g., Start, middle, end] | | | | | ### 4.4 Critical Process Parameters Summary | Process Step | Parameter | Specification | Action Limit | Critical Limit | Frequency of Monitoring | Risk Level | Control Strategy | |--------------|-----------|---------------|--------------|----------------|-------------------------|-----------|-----------------| | [Process Step 1] | [Parameter] | [Specification] | [Action Limit] | [Critical Limit] | [Frequency] | [High/Medium/Low] | [Control Strategy] | | [Process Step 2] | [Parameter] | [Specification] | [Action Limit] | [Critical Limit] | [Frequency] | [High/Medium/Low] | [Control Strategy] | | [Process Step 3] | [Parameter] | [Specification] | [Action Limit] | [Critical Limit] | [Frequency] | [High/Medium/Low] | [Control Strategy] | --- ## 5. Environmental Monitoring Requirements ### 5.1 Non-Viable Particle Monitoring | Location | Cleanroom Grade | Acceptance Criteria "At Rest" | Acceptance Criteria "In Operation" | Results | Performed By | Verified By | Date | |----------|----------------|-------------------------------|-----------------------------------|---------|--------------|------------|------| | [Location 1] | [Grade A/B/C/D] | ≥0.5μm: [Limit] particles/m³<br>≥5.0μm: [Limit] particles/m³ | ≥0.5μm: [Limit] particles/m³<br>≥5.0μm: [Limit] particles/m³ | | | | | | [Location 2] | [Grade A/B/C/D] | ≥0.5μm: [Limit] particles/m³<br>≥5.0μm: [Limit] particles/m³ | ≥0.5μm: [Limit] particles/m³<br>≥5.0μm: [Limit] particles/m³ | | | | | ### 5.2 Viable Monitoring | Location | Cleanroom Grade | Method | Acceptance Criteria | Frequency | Results | Performed By | Verified By | Date | |----------|----------------|--------|---------------------|-----------|---------|--------------|------------|------| | [Location 1] | [Grade A/B/C/D] | [e.g., Active air, Settle plate] | ≤[X] CFU/plate or m³ | [Frequency] | | | | | | [Location 2] | [Grade A/B/C/D] | [e.g., Surface sample] | ≤[X] CFU/contact plate | [Frequency] | | | | | | [Location 3] | [Grade A/B/C/D] | [e.g., Glove print] | ≤[X] CFU/glove | [Frequency] | | | | | ### 5.3 Environmental Conditions Monitoring | Parameter | Location | Frequency | Specification | Reading Time | Result | Performed By | Verified By | |-----------|----------|-----------|---------------|--------------|--------|--------------|------------| | Temperature | [Location] | [Frequency] | [Specification] | [Time 1] | | | | | | | | | [Time 2] | | | | | Humidity | [Location] | [Frequency] | [Specification] | [Time 1] | | | | | | | | | [Time 2] | | | | | Differential Pressure | [Location] | [Frequency] | [Specification] | [Time 1] | | | | | | | | | [Time 2] | | | | | Air Changes | [Location] | [Frequency] | [Specification] | [Time] | | | | | Air Velocity | [Location] | [Frequency] | [Specification] | [Time] | | | | ### 5.4 Personnel Monitoring (for sterile products) | Monitoring Type | Person/Position | Frequency | Acceptance Criteria | Results | Performed By | Verified By | Date | |-----------------|----------------|-----------|---------------------|---------|--------------|------------|------| | Glove prints | [Position] | [Frequency] | ≤[X] CFU/glove | | | | | | Gown/garment testing | [Position] | [Frequency] | ≤[X] CFU/sample | | | | | --- ## 6. Cleaning Verification ### 6.1 Equipment Cleaning | Equipment | Cleaning Procedure | Acceptance Criteria | Result | Verified By | Date | |-----------|-------------------|---------------------|--------|------------|------| | [Equipment 1] | [SOP Reference] | Visual inspection: No residue<br>pH test: [Specification]<br>Swab test: [Specification] | | | | | [Equipment 2] | [SOP Reference] | Visual inspection: No residue<br>pH test: [Specification]<br>Swab test: [Specification] | | | | | [Equipment 3] | [SOP Reference] | Visual inspection: No residue<br>pH test: [Specification]<br>Swab test: [Specification] | | | | ### 6.2 Room Cleaning | Room | Cleaning Procedure | Acceptance Criteria | Result | Verified By | Date | |------|-------------------|---------------------|--------|------------|------| | [Room 1] | [SOP Reference] | Visual inspection: Clean<br>No residues from previous batch | | | | | [Room 2] | [SOP Reference] | Visual inspection: Clean<br>No residues from previous batch | | | | ### 6.3 Line Clearance for Next Batch | Check | Status | Verified By | Date | |-------|--------|------------|------| | All product containers removed | | | | | All documentation removed | | | | | All labels removed | | | | | Equipment cleaned and status updated | | | | | Room cleaned and status updated | | | | | Line clearance approved by QA | | | | --- ## 7. Batch Reconciliation ### 7.1 Raw Material Reconciliation | Material | Initial Quantity | Used Quantity | Returned Quantity | Loss | % Loss | Acceptable Loss | Acceptable (Y/N) | |----------|-----------------|---------------|-------------------|------|--------|----------------|-----------------| | [Material 1] | | | | | | ≤[X]% | | | [Material 2] | | | | | | ≤[X]% | | | [Material 3] | | | | | | ≤[X]% | | ### 7.2 Packaging Material Reconciliation | Material | Initial Quantity | Used Quantity | Returned Quantity | Rejected Quantity | Reconciliation | Acceptable (Y/N) | |----------|-----------------|---------------|-------------------|-------------------|----------------|-----------------| | [Material 1] | | | | | | | | [Material 2] | | | | | | | | [Material 3] | | | | | | | ### 7.3 Yield Reconciliation | Stage | Theoretical Yield | Actual Yield | % Yield | Acceptable Range | Acceptable (Y/N) | Comments | |-------|------------------|--------------|---------|-----------------|-----------------|----------| | [Stage 1] | | | | [e.g., 95.0-102.0%] | | | | [Stage 2] | | | | [e.g., 95.0-102.0%] | | | | Final Product | | | | [e.g., 95.0-102.0%] | | | ### 7.4 Reconciliation Approval | Role | Name | Signature | Date | |------|------|-----------|------| | **Production Supervisor** | | | | | **Quality Assurance** | | | | > **Note:** Any discrepancy outside acceptable limits must be investigated and documented as a deviation. --- ## 8. Deviation Recording and Management ### 8.1 Process Deviations | Deviation No. | Description | Process Step | Date Observed | Reported By | Impact Assessment | CAPA | Risk Level | Status | |---------------|-------------|--------------|--------------|------------|-------------------|------|-----------|--------| | | | | | | | | | | | | | | | | | | | | ### 8.2 Equipment Deviations | Deviation No. | Equipment | Description | Date Observed | Reported By | Impact Assessment | CAPA | Risk Level | Status | |---------------|-----------|-------------|--------------|------------|-------------------|------|-----------|--------| | | | | | | | | | | | | | | | | | | | | ### 8.3 Environmental Deviations | Deviation No. | Parameter | Description | Date Observed | Reported By | Impact Assessment | CAPA | Risk Level | Status | |---------------|-----------|-------------|--------------|------------|-------------------|------|-----------|--------| | | | | | | | | | | | | | | | | | | | | ### 8.4 Deviation Investigation and Resolution Summary | Deviation No. | Root Cause Analysis | Product Impact | QA Assessment | Resolution | Preventive Actions | Closed By | Date Closed | |---------------|---------------------|----------------|--------------|------------|-------------------|-----------|------------| | | | | | | | | | | | | | | | | | | --- ## 9. Quality Review and Disposition ### 9.1 Batch Record Review Checklist | Check | Status | Comments | Reviewed By | Date | |-------|--------|----------|------------|------| | All pages present and in order | | | | | | All required signatures present | | | | | | All critical process parameters within specification | | | | | | All in-process controls within specification | | | | | | Batch reconciliation acceptable | | | | | | All deviations documented and resolved | | | | | | Environmental monitoring results acceptable | | | | | | Cleaning verification acceptable | | | | | | All electronic data reviewed and verified | | | | | | All calculations verified | | | | | ### 9.2 Quality Control Test Results | Test | Specification | Results | Compliance (Y/N) | Tested By | Date | Verified By | Date | |------|---------------|---------|------------------|-----------|------|------------|------| | [Test 1] | [Specification] | | | | | | | | [Test 2] | [Specification] | | | | | | | | [Test 3] | [Specification] | | | | | | | | [Test 4] | [Specification] | | | | | | | ### 9.3 Stability Sample Collection (if applicable) | Sample Type | Quantity | Storage Condition | Collected By | Verified By | Date | |-------------|----------|-------------------|--------------|------------|------| | [Long-term stability] | [Quantity] | [e.g., 25°C/60% RH] | | | | | [Accelerated stability] | [Quantity] | [e.g., 40°C/75% RH] | | | | | [In-use stability] | [Quantity] | [e.g., Room temperature] | | | | ### 9.4 Batch Disposition | Disposition | Comments | |-------------|----------| | [ ] Released | | | [ ] Released with deviation | | | [ ] Rejected | | | [ ] Pending further testing | | ### 9.5 Final Approval | Role | Name | Signature | Date | |------|------|-----------|------| | **Production Manager** | | | | | **Quality Control Manager** | | | | | **Quality Assurance Manager** | | | | | **Qualified Person/QA Release** | | | | --- ## Appendices ### Appendix A: Batch Manufacturing Formula [Detailed manufacturing formula including all ingredients, their quantities, and manufacturing overages] ### Appendix B: Equipment Printouts [List and attach all equipment printouts, e.g., temperature charts, process parameter logs] ### Appendix C: Analytical Test Methods [Reference to analytical test methods used for in-process and finished product testing] ### Appendix D: Reference Documents 1. Master Manufacturing Formula [Document ID] 2. Product Specification File [Document ID] 3. Process Validation Protocol [Document ID] 4. Relevant Standard Operating Procedures: - SOP-XXX: Equipment Operation - SOP-XXX: Line Clearance - SOP-XXX: Cleaning Procedures - SOP-XXX: Environmental Monitoring - SOP-XXX: Deviation Management - SOP-XXX: Batch Record Review - SOP-XXX: Change Control Management - SOP-XXX: Product Quality Review ### Appendix E: GMP Guidance for Batch Record Completion #### General Guidelines: 1. **Data Recording:** - All entries must be made in indelible ink (blue or black) - All entries must be clear, legible, and contemporaneous - No blank spaces should be left - draw a line through any space not used - Never use correction fluid or completely obscure an entry 2. **Error Correction:** - Draw a single line through the error - Enter the correct information - Initial and date the correction - Provide reason for correction where needed 3. **Critical Information:** - All critical process parameters must be verified by a second person - All calculations must be independently checked and verified - Any deviation from specifications must be immediately reported and documented 4. **Electronic Records:** (if applicable) - Follow system access controls - Ensure audit trail functionality is active - Electronic signatures must comply with 21 CFR Part 11 - Backup procedures must be followed #### Regulatory References: - FDA 21 CFR Part 210 - Current Good Manufacturing Practice in Manufacturing, Processing, Packing, or Holding of Drugs - FDA 21 CFR Part 211 - Current Good Manufacturing Practice for Finished Pharmaceuticals - FDA 21 CFR Part 211.186 - Master Production and Control Records - FDA 21 CFR Part 211.188 - Batch Production and Control Records - FDA 21 CFR Part 211.192 - Production Record Review - FDA 21 CFR Part 11 - Electronic Records; Electronic Signatures - EU GMP Chapter 4 - Documentation - EU GMP Chapter 5 - Production - EU GMP Chapter 6 - Quality Control - EU GMP Annex 1 - Manufacture of Sterile Medicinal Products (if applicable) - EU GMP Annex 11 - Computerized Systems - EU GMP Annex 15 - Qualification and Validation - EU GMP Annex 16 - Certification by a Qualified Person and Batch Release - ICH Q7 - Good Manufacturing Practice Guide for Active Pharmaceutical Ingredients - ICH Q8 - Pharmaceutical Development - ICH Q9 - Quality Risk Management - ICH Q10 - Pharmaceutical Quality System - ICH Q12 - Technical and Regulatory Considerations for Pharmaceutical Product Lifecycle Management - PIC/S Guide to Good Manufacturing Practice for Medicinal Products ### Appendix F: Example Batch Record Entry #### Example of Properly Completed Manufacturing Step: **Process Step: Blending** **Procedure:** 1. Transfer sifted materials to the blender. - Critical Parameter: Transfer time after sifting - Acceptance Criteria: ≤ 30 minutes - Actual Value: _20 minutes_ Operator: _JSmith_ Date: _2025-06-15_ - Verified By: _MJones_ Date: _2025-06-15_ 2. Blend for specified time. - Critical Parameter: Blending time - Acceptance Criteria: 15 ± 1 minutes - Actual Value: _15.5 minutes_ Operator: _JSmith_ Date: _2025-06-15_ - Verified By: _MJones_ Date: _2025-06-15_ 3. Record blender settings. - Critical Parameter: Blender speed - Acceptance Criteria: 20 ± 2 RPM - Actual Value: _19 RPM_ Operator: _JSmith_ Date: _2025-06-15_ - Verified By: _MJones_ Date: _2025-06-15_ **In-Process Control:** | Test | Specification | Result | Tested By | Verified By | Date | |------|---------------|--------|-----------|------------|------| | Blend uniformity | RSD ≤ 5.0% | 3.2% | JSmith | MJones | 2025-06-15 | | Bulk density | 0.45-0.55 g/mL | 0.51 g/mL | JSmith | MJones | 2025-06-15 | #### Example of Error Correction: **Procedure:** 1. Add ingredient slowly over specified time. - Critical Parameter: Addition time - Acceptance Criteria: 5 ± 1 minutes - Actual Value: ~~10 minutes~~ 6 minutes JS 2025-06-15 (Transcription error) Operator: _JSmith_ Date: _2025-06-15_ - Verified By: _MJones_ Date: _2025-06-15_ #### Example of Deviation Recording: **Deviation No.:** DEV-2025-123 **Description:** During compression, tablet hardness was found to be 12.5 kP at 10:30 check, which exceeds the upper specification limit of 12.0 kP. **Process Step:** Compression **Date Observed:** 2025-06-15 **Reported By:** JSmith **Impact Assessment:** 100 tablets produced between 10:00-10:30 potentially affected. Batch segregated for further evaluation. **CAPA:** Compression force adjusted to lower setting. Additional hardness testing performed on subsequent tablets which were within specification. **Status:** Closed - QA approved continuation of batch with segregation of affected tablets. See Deviation Report DEV-2025-123 for full details.